Extreme Networks WM-4T1i Spezifikationen Seite 110

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 336
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 109
110 Extreme Networks Consolidated Hardware Guide
Summit Switch Installation
Figure 46: Fitting the mounting bracket into the Summit48si switch
7 Repeat steps 4 through 6 for the other side of the switch.
8 Insert the switch into the rack. Ensure that ventilation holes are not obstructed.
If you are installing a Summit7i switch, you need a minimum of two people to help lift and place the
switch on the helper bracket, and slowly guide the switch into the rack.
9 While holding the switch, secure it with suitable screws (not provided).
If you are installing a Summit7i switch, remove the helper bracket after you secure the chassis.
10 Connect the Summit switch to a redundant power supply (if applicable).
11 To turn on power to the system, connect the AC power cable(s) to the switch and then to the wall
outlet(s). For the Summit4, Summit24, and Summit48 switches, turn the on/off switch to the on
position.
NOTE
The Summit1i, Summit5i, Summit7i, Summit48i, Summit48si, Summit24e3, Summit24e2, and
SummitPx1 switches do not have on/off switches.
48si_rack
Alternate
long bracket
Seitenansicht 109
1 2 ... 105 106 107 108 109 110 111 112 113 114 115 ... 335 336

Kommentare zu diesen Handbüchern

Keine Kommentare